Amazon Sites

Mannings Construction

Drainage remedials at Amazon warehouses in Daventry, Coventry and Rugby. Including concrete and manhole breakout, penstock installation, manhole installation, concrete pours and road markings.

Services provided for this project

A water pipe with two 90 degree bends
Drainage
Outline of a concrete pour cartoon
Substructure
A Lightbulb turned off
Utilities & Services
Outline of a cartoon civil engineer reading a drawing
Civil Engineering
Lawnmower outline
Landscaping
Outline of a Deep Excavation cartoon
Deep Excavation
Outline of a highway with a crossing
Roads & Highways
An outline of water flowing out of a pipe, creating a waterfall and splashing
Maritime Civil
Construction
As part of our partnership with Mannings construction, we were contracted to complete works on several Amazon warehouses/offices in the midlands area.

These projects all involved complex works that required precision planning to effectively manage the time constraints, elevated site security affecting deliveries, confined work areas and working indoors.

The works involved:

-         Breaking out concrete 

-         Carefully lifting the cover slab and inspecting manholes 

-         Installing catchpit 

-         Installing formwork & concrete for penstock 

-         Installing ducting 

-         Reinstate concrete 

-         Installing structural support 


Amazon Daventry also had additional pond penstock works which included:

-         Carefully removing fencing and install gate 

-         Removal of vegetation, sludge and overgrowth 

-         Track matt installation for ground stability 

-         Pumping to dewater pond and remove unwanted material such as twigs, sludge

-         Clean pond outlet 

-         Base slab installation