Copthorne Walk

SEP Construction

This residential development consists of 15x properties and parking bays with roads and utilities infrastructure. We were instructed to complete the groundworks aspects of the project including site clearance drainage, substructure and brick & blockwork

Services provided for this project

A water pipe with two 90 degree bends
Drainage
Outline of a concrete pour cartoon
Substructure
A Lightbulb turned off
Utilities & Services
Outline of a cartoon civil engineer reading a drawing
Civil Engineering
Lawnmower outline
Landscaping
Outline of a Deep Excavation cartoon
Deep Excavation
Outline of a highway with a crossing
Roads & Highways
An outline of water flowing out of a pipe, creating a waterfall and splashing
Maritime Civil
Construction
Description