Tesco Sites

Mannings Construction

Due to flooding in the carpark, remedial works were required on some of the Tesco superstores in Scotland. We completed works in both Tesco Annan and Carluke as well as works installing a scissor lift pit at Tesco express in Glasgow

Services provided for this project

A water pipe with two 90 degree bends
Drainage
Outline of a concrete pour cartoon
Substructure
A Lightbulb turned off
Utilities & Services
Outline of a cartoon civil engineer reading a drawing
Civil Engineering
Lawnmower outline
Landscaping
Outline of a Deep Excavation cartoon
Deep Excavation
Outline of a highway with a crossing
Roads & Highways
An outline of water flowing out of a pipe, creating a waterfall and splashing
Maritime Civil
Construction
As part of our valued partnership with Mannings Construction, we completed works on 3 Tesco sites around Scotland – Annan, Carluke and Glasgow.

Tesco Annan and Carluke required a redesign of the flooding and stormwater management system for the superstore car parks as the ground was retaining too much water during heavy rainfall causing pooling.

We had a plan of works to resolve this issue, add preventative measures and finish with aesthetic landscaping:

-         Excavation and lifting paving blocks 

-         Disposal of spoil 

-         Attenuation tanks/soakaway crates installation 

-         Laying permeable paving and layering stone to promote infiltration into the ground and direct the water flow 

-         Geotextile membrane installation to stabilise the ground and help prevent soil erosion whilst allowing water to pass through 

-         ACO drains and channels installation 

-         Drainage repairs 

-         CCTV drainage inspection reports and topographical survey 

-         Trail pit installation 

-         Kerbing, tarmacking and road markings for parking bays 

-         Working around underground services, using a CAT4 scanner and correctly burying the services, marked with electric warning tape  


For Tesco Express Glasgow we installed a scissor lift pit which involved:

- Breaking out the existing reinforced concrete slab

- Disposing of spoil from the dig

- Installing the structural support

- Installing the data ducting

- Pouring the concrete to form the lift pit.